<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:media="http://search.yahoo.com/mrss/">
  <channel>
    <title>TradeYoke — Compliance</title>
    <link>https://tradeyoke.net/blog/tag/compliance</link>
    <description>The legal duties behind the paperwork — and how to turn them into a calendar.</description>
    <language>en-gb</language>
    <atom:link href="https://tradeyoke.net/blog/tag/compliance/feed.xml" rel="self" type="application/rss+xml" />
    <item>
      <title>The document library that finds a certificate in seconds</title>
      <link>https://tradeyoke.net/blog/document-library-that-finds-a-certificate-in-seconds</link>
      <guid>https://tradeyoke.net/blog/document-library-that-finds-a-certificate-in-seconds</guid>
      <pubDate>Tue, 22 Sep 2026 00:33:16 GMT</pubDate>
      <description>"It's in here somewhere" is not a filing system. Here's what actually makes trade paperwork findable — and how TradeYoke searches inside the file, not just its name, to find the certificate that mentions a serial number or a customer's name.</description>
      <content:encoded><![CDATA[### Why "I know it's in here somewhere" costs you time

Quick answer: most trade businesses end up with paperwork spread across a laptop folder, a phone camera roll and an email inbox, named after nothing useful — so finding one specific certificate means opening file after file until you recognise it, usually while a landlord or an inspector is waiting on the phone.

Certificates, signed quotes, job photos, a van's MOT, the insurance schedule — none of these are rare in a trade business, and none of them are optional to keep. The problem isn't that the paperwork doesn't exist; it's that it's stored the way it was created — a photo here, a PDF download there, a scan emailed from a customer — with no consistent name and no single place it all lives. The result is the same for every trade we've spoken to: the document exists, but finding it costs five or ten minutes you don't have while someone's waiting for the answer.

### What actually works for paperwork, TradeYoke or not

Quick answer: file everything in one place against the job and the customer, name it consistently, track expiry dates somewhere you'll actually see them, and — the step most systems miss — make it searchable by what's written inside the file, not just its filename.

### Five habits that make paperwork findable

- ✓ Pick one place, not three — A certificate on the laptop, a photo on the phone and a scan in an email are three places to search when you need it once.
- ✓ File against the job and the customer at once — A record that only lives in a generic "Documents" folder is a record you have to remember to go looking for.
- ✓ Name it so a stranger could find it — "cert2.pdf" tells you nothing six months later; "EICR — 14 Oak Road — 2026-09-25" tells you everything.
- ✓ Track the expiry date, not your memory — A gas safety record or an EICR has a legal renewal date; the only reliable place to keep it is on the document itself.
- ✓ Search what's inside, not just the filename — The fastest way to find a certificate is to search for the boiler serial number or the customer's name it mentions — most filing systems can't do that.

### What the trade-software market offers today

Quick answer: UK trade job-management software generally stores and organises compliance paperwork well — folders, job attachment, mobile capture — but stops short of searching what's actually written inside a file, so finding a specific certificate still means opening several before you recognise the right one.

Looking at what's already on the market: Joblogic stores Gas Safe certificates and NICEIC documentation against the job with offline mobile capture, and keeps compliance records "securely in one place". Fergus and Powered Now offer similar filing — certificates, inspection records and photos held alongside the job. That's genuinely useful, and TradeYoke's own Document Library does the same filing. Where the market stops, consistently, is search: none of the trade software we looked at searches the text inside a PDF or a scanned certificate for a name, a serial number or a reference — you can find the folder, but not the fact.

[Image: The TradeYoke document library with folders, expiry dates and a search result]

### How TradeYoke finds it in seconds: search that reads the file

Quick answer: TradeYoke's Document Library indexes the text inside a file — PDF, Word, Excel and PowerPoint, plain text, HTML, and images through OCR — so a search for a boiler serial number or a circuit reference finds the certificate that mentions it, with a snippet showing why it matched.

Every document filed in TradeYoke — a certificate the app generated, a photo taken on site, a customer's signed quote, a scanned insurance schedule — is filed against the job and the customer at once, with an optional expiry date that lands on a dashboard tile the moment it's due or overdue. On top of that, TradeYoke reads what's actually inside the file: PDFs (including scanned ones, through OCR), Word, Excel and PowerPoint documents, plain text and HTML, and photos and scans through the same OCR engine. A search doesn't just match a filename — it matches the boiler model printed on a service record, or the name on a signed quote — and shows the snippet of text that matched, so you know at a glance which result is the right one. A backlog sweep quietly re-indexes anything that was missed the first time, so the search stays complete even after a bulk import.

**What file types can it search inside?**

PDF (including scanned certificates), Word, Excel and PowerPoint, plain text and HTML, and images through OCR — the same engine also makes video transcriptions searchable.

**Where are the files stored?**

In your business's own storage container, alongside your other data — not a third-party document tool you have to keep in sync.

**Can I take a photo from the phone and file it straight away?**

Yes, on iPhone, Android and Windows — a photo or video taken on site files straight against the job.

**Does a document show on the customer's record too?**

Yes — anything filed against a job also shows on that customer, so their file and the job's file are the same file.

Related: Document library & search inside files · Electrical certificates · Paperwork & compliance · EICR every five years

### Stop hunting for the right file

30 days of Essentials free, no card required. File your first certificates and search for one by what's written inside it.

[Start your free trial](https://app.tradeyoke.net/signup)

]]></content:encoded>
      <dc:creator>TradeYoke team</dc:creator>
      <category>Documents</category>
      <category>Compliance</category>
      <category>Guides</category>
      <enclosure url="https://tradeyoke.net/media/media-seed-help-documents-search-png/help-documents-search.png?v=1pueg4xq" type="image/png" length="72613" />
      <media:content url="https://tradeyoke.net/media/media-seed-help-documents-search-png/help-documents-search.png?v=1pueg4xq" medium="image" />
    </item>
    <item>
      <title>Keeping a lone-working tradesperson safe: what actually helps</title>
      <link>https://tradeyoke.net/blog/keeping-a-lone-working-tradesperson-safe</link>
      <guid>https://tradeyoke.net/blog/keeping-a-lone-working-tradesperson-safe</guid>
      <pubDate>Sun, 20 Sep 2026 23:33:16 GMT</pubDate>
      <description>A scaffolder on their own on a roof, an electrician alone in a plant room, a solar installer working a rural site — lone working is normal in these trades. Here's what genuinely reduces the risk, and how TradeYoke gives the office real visibility without a box wired into the van.</description>
      <content:encoded><![CDATA[### What "lone working" risk actually means for a trade business

Quick answer: lone working means nobody else is there to help if something goes wrong — a fall, an electric shock, a confined space, or simply a medical event — and for scaffolders, electricians and solar installers working roofs, plant rooms and rural sites on their own, that's not the exception, it's most of the working week.

The Health and Safety Executive is clear that working alone isn't against the law, but the employer still has to assess and control the risk it creates — the same duty as any other hazard, just with nobody standing next to the worker to notice if it goes wrong. For a scaffolder erecting a lift on their own, an electrician isolating a circuit in an empty plant room, or a solar installer on a rural roof with no phone signal, the risk isn't a dramatic one-off event; it's the ordinary risks of the job, made worse by the fact that help could be hours away rather than minutes.

### What actually reduces the risk, TradeYoke or not

Quick answer: a written risk assessment for the specific job, a check-in routine with a named person who notices if it's missed, and visibility of where the worker actually is — those three things are what every HSE-aligned lone-working guide comes back to.

### What genuinely helps a lone worker

- ✓ Assess the job before it starts, not after — A five-minute lone-working risk assessment for a specific site catches the things a generic policy misses — access, signal, the nearest help.
- ✓ Give someone visibility of where you are — Someone in the office (or another team member) knowing roughly where you are and when you're due back turns a silent no-show into a noticed one.
- ✓ Have a named person who'd notice — A check-in routine only works if someone is actually responsible for chasing a missed one — 'someone would probably notice' is not a plan.
- ✓ Use a certified alarm device for genuinely high-risk work — For confined spaces or high-fall-risk work, a monitored BS 8484 lone-worker device with a 24/7 response centre is a different, more serious tool than general visibility — the two aren't interchangeable.
- ✓ Keep the paperwork — A dated risk assessment and a record of who was where is what you'd want to be able to show if something did go wrong.

### What the market offers today, and where it splits in two

Quick answer: the market splits into dedicated, monitored lone-worker alarm services (SoloProtect, Peoplesafe) built for genuinely high-risk roles, and general trade job-management software (Jobber, Tradify, ServiceM8) whose GPS tracking is built for dispatch, not framed as a safety feature at all.

Dedicated lone-worker providers like SoloProtect and Peoplesafe sell a serious, purpose-built product: a monitored personal alarm, often BS 8484 certified, backed by a 24/7 response centre that can raise an actual emergency response. That's the right tool for high-risk lone work and TradeYoke doesn't claim to replace it. Separately, general trade software offers GPS tracking too — Jobber's waypoint tracking and Tradify's staff map, for instance — but it's built and marketed for dispatch and route efficiency, not as a safety measure, and it lives in a system that has nothing to do with the certificate or risk-assessment paperwork the job actually needs. Neither camp gives a small trade team the specific thing most of them actually want: the office being able to glance at a map and know where the lone worker on today's roof job is, in the same account as the job itself.

[Image: TradeYoke's live monitoring map: the team, today's jobs and vehicles together, consent-gated]

### How TradeYoke helps: visibility in the same account as the job

Quick answer: TradeYoke's live monitoring shows everyone sharing location on one map, with the phone itself as the tracker (no extra hardware), consent-gated per worker, alongside roles, permissions and an audit trail that keep the whole team accountable — it gives the office real visibility, not a monitored emergency-alarm service.

TradeYoke's Live monitoring (part of the Ultimate plan) turns the phone already in a scaffolder's or electrician's pocket into the tracker — there's no separate device to buy, charge or fit to a van. Each worker consents to sharing their location and can see exactly what's shared; the office sees everyone, today's jobs, customers and vehicles together on one map, with a trail that can be replayed if you need to check where someone was. It's honest about what it is: this is visibility for the office, not a certified, monitored panic-alarm service — for genuinely high-risk lone work, that's still a job for a dedicated BS 8484 device alongside it, not instead of it. Alongside it, TradeYoke's roles and permissions give every action an audit trail, so it's always clear who's assigned to which job and who did what, which matters as much for accountability as for safety.

**Does TradeYoke replace a monitored lone-worker alarm device?**

No. Live monitoring gives the office visibility of where the team is; a certified, monitored BS 8484 device with a 24/7 response centre is a different, more serious tool for genuinely high-risk lone work, and the two work well alongside each other rather than as substitutes.

**Do I need to fit tracking hardware in the van?**

No — the phone app itself is the tracker. Dedicated vehicle-tracking devices can be added through the same seam if you already have them.

**Can a worker see they're being tracked?**

Yes. Tracking is consent-gated per worker, and each person can see exactly what's being shared.

**Which plan includes live monitoring?**

Ultimate, TradeYoke's top plan — it also includes your own website and the customer portal. See /pricing for what every plan includes.

Related: Live monitoring & tracking · Roles, permissions, audit & 2FA · Team & safety · Van tracking without the hardware

### See where the team is, without new hardware

30 days of Essentials free, no card required. Live monitoring is part of the Ultimate plan — start a trial and see the map against a real day.

[Start your free trial](https://app.tradeyoke.net/signup)

]]></content:encoded>
      <dc:creator>Carl Randall</dc:creator>
      <category>Compliance</category>
      <category>Product</category>
      <category>Guides</category>
      <enclosure url="https://tradeyoke.net/media/media-seed-app-live-monitoring-png/app-live-monitoring.png?v=7js7qxat" type="image/png" length="554444" />
      <media:content url="https://tradeyoke.net/media/media-seed-app-live-monitoring-png/app-live-monitoring.png?v=7js7qxat" medium="image" />
    </item>
    <item>
      <title>The landlord gas safety record: every 12 months, copy within 28 days</title>
      <link>https://tradeyoke.net/blog/landlord-gas-safety-record-every-12-months</link>
      <guid>https://tradeyoke.net/blog/landlord-gas-safety-record-every-12-months</guid>
      <pubDate>Sun, 14 Jun 2026 11:15:11 GMT</pubDate>
      <description>The landlord gas safety record is the most predictable repeat work in the gas trade. Here are the rules, the two-month window, and how to turn the date into a booking.</description>
      <content:encoded><![CDATA[A landlord gas safety record must be renewed every 12 months by a Gas Safe registered engineer, and the landlord must give every tenant a copy within 28 days of the check. For an engineer, that is a job with a date on it before the van has left the drive.

Most of the gas trade is reactive: a boiler fails, a phone rings. The landlord check is the opposite. The same properties come round every year, the same agents manage them, and the work found while you are there is yours to quote. This post sets out the rules, then shows how to make the calendar do the chasing.

### What the landlord gas safety record requires

The duty comes from regulation 36 of the Gas Safety (Installation and Use) Regulations 1998. A landlord must have every gas appliance and flue they provide checked for safety every 12 months by a Gas Safe registered engineer, and must keep a record of each check for two years.

The record covers the pipework, and the appliances and flues the landlord supplies. A tenant's own cooker is the tenant's, though the pipework feeding it is still the landlord's responsibility. The engineer records each appliance, the checks made, any defects and any action taken.

Existing tenants must get a copy within 28 days of the check. New tenants must get one before they move in. The 28 days is the landlord's deadline, not yours, but a letting agent wants the record the same day so it can be filed against the tenancy. The HSE landlord pages are the place to confirm anything in this section.

[Gas safety - landlords and letting agents](https://www.hse.gov.uk/gas/landlords/): The Health and Safety Executive's guidance on landlord duties: annual checks, records, copies to tenants and the two-month flexibility.

### The two-month window that keeps the date fixed

Since April 2018 a landlord has been able to have the annual check done in the two months before the deadline and keep the original expiry date, in the same way an MOT can be renewed early without losing time. A check done earlier than that resets the date to 12 months from the new check.

For an engineer this is the useful bit. You can book the visit any time from ten months after the last one, which turns a single fixed day into an eight-week window. Agents with a portfolio will happily take a whole street on one morning if the dates allow it.

> 💡 Book the next landlord check in the window, not on the day. Ten to twelve months after the last check keeps the expiry date fixed and gives you eight weeks of flexibility to fill a route.

### Why the gas safety record is the best repeat work in the trade

Three things make it valuable. It repeats on a known date. It comes in bundles, because agents manage dozens of properties and want one engineer they trust. And it puts you in front of every boiler in the portfolio once a year, which is where services, warning notices and replacements come from.

The failure mode is equally simple. The date sits on a certificate in a folder, nobody looks at the folder, and the agent books whoever answers the phone first. The engineer who wins the renewal is the one who asked before anyone else did.

> Reactive work finds you. Compliance work is waiting for you on a date you already know. — TradeYoke

### Turning 12 months into a calendar

The Plumber and gas trade in TradeYoke is in pilot with real gas businesses. It produces the Landlord Gas Safety Record as a PDF, files it against the job and the customer with its expiry date, and shows a certificates page that filters what is due within 30, 60 or 90 days. Read about the pilot on the plumber and gas page.

Because the record carries an expiry, the document library warns before it lapses, and the next visit can be booked as a recurring job the day the first one is done. A scheduled reminder to the agent, sent eight weeks out, lands at the start of the two-month window rather than on the day the record expires.

The same visit becomes an invoice from the job, and if it is not paid on the day it appears in the morning 'who owes me' email until it is.

[Image: The document library shows each certificate with its expiry, so a landlord record due next month is visible before the agent asks.]

> ⚠️ Plumber and gas is a pilot trade in TradeYoke. The certificates described here are being used by pilot businesses now; pilot trades are priced with those businesses rather than from the pricing page.

### Sending the record to the agent, and proving you did

Emailing a certificate from a personal inbox works until someone asks, six months later, whether it was ever sent. Sending from the record itself writes the send into the communications history with the date, the address and the file, so the question answers itself.

Agents also like consistency. A branded email with the record attached and the next-due date in the body reads as a service, not a favour. The same message wizard that sends the 'we're coming tomorrow' text sends the certificate, and replies land in the customer's thread. Gas engineers who also do electrical work run both on one account; the trades page lists every trade, and the plans on the pricing page are per business rather than per trade.

See also: the full Paperwork & compliance guide

### Who needs what, and when

| Duty | Deadline | Who it falls on |
|---|---|---|
| Annual gas safety check | Every 12 months (early in the two-month window keeps the date) | Landlord, carried out by a Gas Safe engineer |
| Copy to existing tenants | Within 28 days of the check | Landlord or agent |
| Copy to new tenants | Before they move in | Landlord or agent |
| Keep the record | Two years | Landlord |

### The annual landlord visit

- ✓ Confirm the Gas Safe registration is current — Your ID card is the first thing a careful agent checks.
- ✓ List every appliance and flue the landlord provides — Include the pipework; note tenant-owned appliances separately.
- ✓ Record defects and what you did about them — A warning notice or a disconnection is part of the record, not a separate story.
- ✓ Date the next check inside the two-month window — Ten to twelve months from this one keeps the expiry fixed.
- ✓ Send the record from the job — So the send is on file with the certificate.

### Questions people ask

**Does a gas safety record expire on an exact date?**

Yes. The record shows the date of the check, and the next one is due within 12 months of it. A check done in the two months before that date can keep the original expiry; a check done earlier resets it. Confirm the current wording on HSE's landlord pages.

**What if the tenant will not give access?**

The landlord must take all reasonable steps to get the check done. That means recorded attempts: letters, calls and messages with dates. Keep the evidence with the property record, and tell the agent in writing when access was refused so the file shows it was not the engineer who slipped.

**Is a boiler service the same as a gas safety check?**

No. The safety check covers safe operation of each appliance and flue; a service is maintenance recommended by the manufacturer. Many landlords book both together because the engineer is already there, and that is the upsell the annual visit was made for.

**Do I need a record for a tenant's own appliance?**

The landlord's duty covers appliances and flues they provide, plus the installation pipework. A tenant's own appliance is not the landlord's to certify, though a flue serving it may be. When in doubt, check HSE's guidance or Gas Safe Register.

### Put the next landlord check on the calendar today

TradeYoke's plumber and gas pilot files the record with its expiry, reminds the agent in the window and books the next visit from this one. Start a 30-day trial of Essentials with no card.

[Start your free trial](https://app.tradeyoke.net/signup)

]]></content:encoded>
      <dc:creator>TradeYoke team</dc:creator>
      <category>Plumbing</category>
      <category>Compliance</category>
      <enclosure url="https://tradeyoke.net/media/media-seed-cover-landlord-gas-safety-record-every-12-months-jpg/cover-landlord-gas-safety-record-every-12-months.jpg?v=9fpmol" type="image/jpeg" length="60419" />
      <media:content url="https://tradeyoke.net/media/media-seed-cover-landlord-gas-safety-record-every-12-months-jpg/cover-landlord-gas-safety-record-every-12-months.jpg?v=9fpmol" medium="image" />
    </item>
    <item>
      <title>EICR every five years: turning a legal duty into repeat work</title>
      <link>https://tradeyoke.net/blog/eicr-every-five-years</link>
      <guid>https://tradeyoke.net/blog/eicr-every-five-years</guid>
      <pubDate>Wed, 10 Jun 2026 07:15:11 GMT</pubDate>
      <description>Private landlords in England must have an EICR at least every five years. That is a rebooking you can date on the day you issue the certificate.</description>
      <content:encoded><![CDATA[In England, a private landlord must have the electrical installation in a rented home inspected and tested at least every five years by a qualified and competent person, and must give the tenant a copy of the Electrical Installation Condition Report (EICR) within 28 days. That five-year cycle has a date on it, and the electrician who issued the last report is the natural person to book the next one.

The rules are short. Most of the value is in what you do with the expiry once the certificate is signed.

### What 'EICR every five years' means for a landlord

The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 apply to all private tenancies, and have done since April 2021. The installation must meet the 18th edition of the Wiring Regulations, BS 7671, and be inspected and tested at least every five years, or sooner if the previous report says so.

The landlord must give the report to the existing tenant within 28 days of the inspection, to a new tenant before they move in, and to the local authority within seven days of a request. If the report requires remedial work, it must be done within 28 days, or sooner if the report says so, and the landlord must send written confirmation to the tenant and the council within 28 days of completing it. Councils can fine up to £30,000 for a breach.

Scotland and Wales have their own regulations with the same five-year rhythm. The government guidance is the place to confirm the detail for England.

[Electrical safety standards in the private rented sector: guidance](https://www.gov.uk/government/publications/electrical-safety-standards-in-the-private-rented-sector-guidance-for-landlords-tenants-and-local-authorities): Official guidance for landlords, tenants and local authorities on the 2020 regulations: five-year inspections, deadlines, remedial work and penalties.

### Reading the outcome: satisfactory or not

An EICR ends in one of two words. Satisfactory means the installation is safe for continued use. Unsatisfactory means at least one observation was coded as needing action. The codes are the same on every report.

### EICR observation codes

| Code | Meaning | What it does to the outcome |
|---|---|---|
| C1 | Danger present. Risk of injury; immediate action required | Unsatisfactory |
| C2 | Potentially dangerous. Urgent remedial action required | Unsatisfactory |
| C3 | Improvement recommended | Does not make the report unsatisfactory |
| FI | Further investigation required without delay | Unsatisfactory |

A C3 is a recommendation; it does not stop a landlord letting the property. A C1, C2 or FI starts the 28-day remedial clock. Being clear about that in the covering email saves a week of anxious phone calls from the agent.

### The certificate is the booking for five years' time

Every EICR states when the next inspection is recommended. Five years is the maximum for a rental; the inspector can set a shorter interval if the condition warrants it. Either way, the date is known on the day you sign, which is the point most electricians miss.

Put the expiry somewhere that will surface it. A calendar entry in five years is a start; a certificate with an expiry attached to the customer's record is better, because it surfaces next to the property's history when the agent rings about something else. The Electrician trade in TradeYoke is in pilot with real firms and does exactly this: the EICR is produced with validation and outcome, rendered as a PDF and filed with its expiry against the job and the customer. See the electrician page for what the pilot covers.

[Image: Certificates filed with an expiry show up on the expiring-documents tile long before the five years is up.]

> ✅ Send the landlord or agent a reminder three months before the EICR expires. It lands while they still have time to book you, not while they are searching for anyone who can come this week.

### Remedials are the second job

An unsatisfactory report is not bad news for the electrician who wrote it; it is a quote. The C1 and C2 observations become the lines of that quote, the quote becomes a job, and the job becomes an invoice. The landlord gets the written confirmation the regulations ask for, and the file shows the whole chain.

The quotes board in the platform keeps that chain visible: waiting on the customer, accepted, ready to book, booked. When the remedial invoice goes unpaid it turns up in the polite chasing sequence rather than in a spreadsheet you forgot to open.

> An unsatisfactory EICR is the only certificate that arrives with its own quote attached. — TradeYoke

### Running the five-year cycle in practice

### The five-year EICR rhythm

- ✓ Issue the report with the next-inspection date on it — Five years at most for a rental; shorter if the condition warrants.
- ✓ File it with an expiry against the property and the landlord — Where it will surface, not where it will be forgotten.
- ✓ Quote the C1 and C2 observations the same day — The remedial clock is 28 days; the quote should not use ten of them.
- ✓ Remind the agent three months before expiry — By email or text, from the record so the send is on file.
- ✓ Book the next inspection inside the window — Then the cycle runs itself.

Landlords with gas appliances have a parallel duty every 12 months, covered in the landlord gas safety record post. Agents managing both like one supplier who reminds them about both, which is one reason compatible trades share an account on TradeYoke. The plans on the pricing page are per business, not per trade or per user.

See also: the document library that finds a certificate in seconds

### Questions people ask

**Is an EICR the same as an EIC?**

No. An Electrical Installation Certificate (EIC) is issued for new work, a new installation or a major alteration, and confirms it was designed, built and tested to BS 7671. An EICR is a periodic condition report on an existing installation. A brand-new installation with an EIC still needs an EICR within five years of it if the property is let.

**Do HMOs need an EICR more often?**

Houses in multiple occupation fall under the same five-year maximum, and licensing conditions may add requirements. The licence is set by the local council, so check the conditions on it rather than assuming the standard cycle is enough.

**Does a homeowner need an EICR every five years?**

There is no legal requirement for an owner-occupier, though one is widely recommended every ten years, when buying a property, or before major work. The five-year rule is specifically for private rented homes.

**Who counts as a qualified and competent person?**

The regulations do not name a register. Government guidance points landlords to competent-person schemes and to electricians who can demonstrate qualification and experience for inspection and testing. Membership of a scheme such as NICEIC or NAPIT is the simplest way to show it.

### Make the next EICR the easiest booking you win

TradeYoke's electrician pilot files every certificate with its expiry, quotes the remedials and reminds the agent before the five years is up. Start a 30-day trial of Essentials with no card.

[Start your free trial](https://app.tradeyoke.net/signup)

]]></content:encoded>
      <dc:creator>TradeYoke team</dc:creator>
      <category>Electrical</category>
      <category>Compliance</category>
      <enclosure url="https://tradeyoke.net/media/media-seed-cover-eicr-every-five-years-jpg/cover-eicr-every-five-years.jpg?v=h4wd1x" type="image/jpeg" length="60927" />
      <media:content url="https://tradeyoke.net/media/media-seed-cover-eicr-every-five-years-jpg/cover-eicr-every-five-years.jpg?v=h4wd1x" medium="image" />
    </item>
    <item>
      <title>Scaffold inspections every 7 days: the record that keeps you compliant</title>
      <link>https://tradeyoke.net/blog/scaffold-inspections-every-7-days</link>
      <guid>https://tradeyoke.net/blog/scaffold-inspections-every-7-days</guid>
      <pubDate>Fri, 05 Jun 2026 09:15:11 GMT</pubDate>
      <description>The Work at Height Regulations 2005 require a scaffold to be inspected after it goes up, at intervals not exceeding seven days, and after anything that could affect it. The record is the proof.</description>
      <content:encoded><![CDATA[Under the Work at Height Regulations 2005, a scaffold must be inspected by a competent person after it is installed and before it is first used, at intervals not exceeding seven days while it stands, and after any event likely to have affected its strength or stability. The written inspection record is what proves any of that happened.

The rules are not complicated. The hard part is running them across twenty live sites, in weather, with a team that changes week to week, and being able to show the record when someone asks for it.

### What the Work at Height Regulations say about scaffold inspections every 7 days

Regulation 12 of the Work at Height Regulations 2005 covers inspection of work equipment. For a working platform used for construction work from which a person could fall two metres or more, it requires an inspection after assembly in its position and before first use, and then at intervals not exceeding seven days. It also requires an inspection after any event likely to have affected the strength or stability of the equipment.

The inspection must be carried out by a competent person. A written report must be prepared before the end of the working period in which the inspection was completed, given to the person on whose behalf it was carried out within 24 hours, kept on site until the work is finished, and kept at an office for three months after that. Confirm the detail on legislation.gov.uk and the HSE's scaffolding pages.

[Scaffold checklist](https://www.hse.gov.uk/construction/safetytopics/scaffoldinginfo.htm): The Health and Safety Executive's scaffolding page: competence, design, and the inspection duties after installation, every seven days and after adverse weather or alteration.

### After wind, after alteration, after a strike

The seven-day interval is the floor, not the whole duty. High winds, heavy rain, snow loading, a vehicle strike, an alteration by anyone including the client's own trades, or a period out of use all count as events likely to affect the scaffold, and each one triggers an inspection before the platform is used again.

In practice that means the weekly round is only part of the calendar. A named storm on a Wednesday means an inspection on Thursday, whatever day the last one was. A written record of that inspection, with the reason for it, is what shows the site was managed rather than lucky.

> ⚠️ The seven days are calendar days, not working days. A scaffold inspected on a Monday is due again by the following Monday, whether or not anyone worked on it in between.

### Handover: the day the scaffold becomes someone else's

Handover is where the inspection clock starts. The scaffold is erected to its design, or to the relevant TG20 compliance sheet where no bespoke design is needed, inspected, tagged and handed to the client with a handover certificate. From that point the user of the scaffold is responsible for making sure the seven-day inspections happen, and the HSE's guidance puts that duty on the user or hirer, not automatically on the scaffolder.

Most scaffold companies contract to do the weekly inspections anyway, because their competent people are the ones who know the structure. That is a service line as well as a duty, and it needs the same discipline as the erection: a named inspector, a date, a record.

### What the inspection record needs to show

Schedule 7 of the regulations lists what a report must contain. Ticking a box on a tag is not enough on its own.

### Schedule 7: the written inspection report

- ✓ Who it was carried out for — The name and address of the person on whose behalf the inspection was done.
- ✓ Where the scaffold is — The location of the work equipment inspected.
- ✓ What was inspected — A description of the equipment.
- ✓ When — The date and time of the inspection.
- ✓ What was found — Details of any matter that could give rise to a risk to the health or safety of any person.
- ✓ What was done about it — Details of any action taken as a result.
- ✓ What still needs doing — Any further action considered necessary.
- ✓ Who inspected it — The name and position of the person making the report.

### Where TradeYoke is with scaffolding

Scaffolding is a pilot trade in TradeYoke, being used by real scaffold businesses now. The pilot runs projects with a customer, site, status and the trades involved; erect and dismantle visits on the diary; documents with expiry dates; team and vehicle registers; and quotes and invoices raised from the project. The scaffolding page describes what is in use today.

The scaffold register, the seven-day inspection records and the handover certificates are in development with the pilot businesses. They are not finished, and this post will not pretend otherwise. The design intent is the one described above: a project holds its scaffolds, each scaffold holds its inspections, an inspection that is due surfaces on the dashboard, and the report carries the Schedule 7 particulars so it stands up on its own.

[Image: Inspections in TradeYoke: checklist-based, pass or fail each item, evidence for every fail, signed off on the pad]

> 💡 Until the inspection records ship, pilot businesses file their inspection reports as documents on the project with a seven-day expiry, so the document library warns when the next one is due.

Two things already in the platform help now. The document library takes a photo from the phone and files it against the project with an expiry, which is how a wind-damage inspection gets evidenced on the day. And live monitoring shows which of the team is nearest a site when a client rings about a strike; that is covered in the post on tracking without hardware.

Scaffold work is also where projects earn their keep, because a site often carries more than one trade. Running two trades on one account explains how a project holds them together. Pilot trades are priced with the pilot businesses rather than from the pricing page.

See also: the full Paperwork & compliance guide

### When a scaffold must be inspected

| Trigger | Timing | Record |
|---|---|---|
| After installation or assembly | Before first use, in position | Written report within the working period |
| While it stands | At intervals not exceeding 7 days | Written report each time |
| After an event affecting strength or stability | Before use again | Written report stating the reason |
| After alteration | Before use again | Written report |

### Questions people ask

**Who is responsible for the seven-day inspections: the scaffolder or the site?**

The regulations place the duty on the employer or person in control of the work, which in practice is the user or hirer of the scaffold. Scaffold companies are usually contracted to carry the inspections out because they have the competent people, but the contract should say so in writing.

**Do the seven days include weekends?**

Yes. The regulation says intervals not exceeding seven days, which means calendar days. If the last inspection was on a Monday, the next is due by the following Monday.

**What if the scaffold is not used for a fortnight?**

It still needs an inspection before it is used again, and a period out of use is itself a reason to inspect. Most contractors keep the weekly rhythm going regardless because it is simpler to prove than an exception.

**Does a mobile tower need the same inspections?**

The regulation covers any working platform used for construction work from which a person could fall two metres or more, so towers are in scope: inspect after assembly and at intervals not exceeding seven days. HSE publishes separate tower guidance; check it for the detail on re-inspection after moving one.

### Run every site on one calendar

TradeYoke's scaffolding pilot holds projects, visits, documents and the team in one place, with inspection records on the way. Start a 30-day trial of Essentials with no card.

[Start your free trial](https://app.tradeyoke.net/signup)

]]></content:encoded>
      <dc:creator>TradeYoke team</dc:creator>
      <category>Scaffolding</category>
      <category>Compliance</category>
      <enclosure url="https://tradeyoke.net/media/media-seed-cover-scaffold-inspections-every-7-days-jpg/cover-scaffold-inspections-every-7-days.jpg?v=21fczkl" type="image/jpeg" length="65193" />
      <media:content url="https://tradeyoke.net/media/media-seed-cover-scaffold-inspections-every-7-days-jpg/cover-scaffold-inspections-every-7-days.jpg?v=21fczkl" medium="image" />
    </item>
    <item>
      <title>The MCS certificate, explained for installers and their customers</title>
      <link>https://tradeyoke.net/blog/mcs-certificate-explained-for-installers</link>
      <guid>https://tradeyoke.net/blog/mcs-certificate-explained-for-installers</guid>
      <pubDate>Sun, 31 May 2026 11:15:11 GMT</pubDate>
      <description>The MCS certificate is what proves a solar install was done to the scheme's standards, and it is what unlocks the Smart Export Guarantee for your customer. Here is what it is, what MCS needs from you, and what goes in the handover pack.</description>
      <content:encoded><![CDATA[An MCS certificate is the document that says a solar PV, battery or heat pump installation was carried out by an MCS-certified installer, using MCS-certified products, to the scheme's standards. Customers need it because it is what a supplier asks for before paying the Smart Export Guarantee. Installers need to issue it promptly and file it where it can be found in ten years.

This post is written for both sides of the handover: the installer who has to produce it, and the customer who is going to ask what it is for.

### What the MCS certificate actually is

MCS is the Microgeneration Certification Scheme, the UK quality mark for small-scale renewable installations. It certifies two things separately: products, which must meet the relevant MCS product standard, and installers, who are assessed against the installation standards and audited to stay on the register.

When a certified installer commissions a system using certified products, they register the installation on the MCS database and the customer receives an MCS certificate for it. The certificate identifies the installer, the products, the system size and the commissioning date. It is not a warranty and it is not an electrical certificate; it sits alongside both. The MCS website holds the current standards and the installer search customers use to check you.

[MCS - Microgeneration Certification Scheme](https://mcscertified.com/): The scheme's own site: installer and product search, the installation standards, and current scheme rules.

### Why customers care: the Smart Export Guarantee

The Smart Export Guarantee (SEG) has been in place since January 2020. Licensed electricity suppliers with 150,000 or more domestic customers must offer a tariff that pays for electricity exported to the grid, and the rate must be above zero. Beyond that the suppliers set their own rates, so they vary and change.

To get an SEG tariff the customer needs an MCS certificate or an equivalent recognised by the supplier, an export meter capable of half-hourly readings (a smart meter in practice), and a system no larger than 5 MW. The certificate is therefore the first thing the customer's supplier asks for, which makes it the first thing the customer asks you for. Ofgem's page on the scheme is the reference.

[Smart Export Guarantee (SEG)](https://www.ofgem.gov.uk/environmental-and-social-schemes/smart-export-guarantee-seg): Ofgem's description of the scheme: which suppliers must offer a tariff, eligibility including the MCS requirement, and the 5 MW cap.

### The data sheet: what MCS wants from you

Registering the installation means submitting a data sheet: installer and customer details, the site, the certified products by model, system capacity in kWp, orientation and tilt, the estimated annual generation worked out with the MCS method, the commissioning date and the DNO notification. Get any of it wrong and the certificate is wrong, and correcting it later is a chore.

MCS expects the installation to be registered promptly after commissioning, within days rather than months; the scheme rules set the exact window, so check the current version. The practical answer is to fill the data sheet in on site while the panel labels are in front of you. The Solar installer trade in TradeYoke is in pilot with real installers and does this: the MCS submission data sheet is a form on the job, the design and files can be imported from OpenSolar, and the sheet is filed with the certificate. The solar installer page lists what the pilot covers.

[Image: The document library where the MCS data sheet, commissioning certificate and handover pack are filed against the job, with expiry tracked]

> ⚠️ Solar installer is a pilot trade in TradeYoke. The documents described here are in use by pilot businesses; pilot trades are priced with those businesses rather than from the pricing page.

### The handover pack

The handover pack is what the customer keeps, shows their supplier, and hands to the buyer when the house is sold. A thin pack costs you phone calls for years. A full one costs you twenty minutes.

### What belongs in the handover pack

- ✓ MCS certificate — The scheme certificate for the installation.
- ✓ Commissioning certificate — System tests and readings on the day it went live.
- ✓ DNO paperwork — The G98 notification or the G99 approval, whichever applied.
- ✓ Electrical certificate — The EIC or Minor Works certificate for the electrical work, to BS 7671.
- ✓ Performance estimate — The annual generation estimate from the MCS method, with the assumptions.
- ✓ Single-line diagram and layout — So the next engineer can see what was installed and where.
- ✓ Warranties and manuals — Panels, inverter, battery, mounting, and the workmanship warranty.
- ✓ Building control notification — Where the work was notifiable under Part P.

The pilot produces the customer handover pack from the job, pulling in the certificate, the commissioning record, the single-line diagram and the DNO application, and emails it from the record so the send is on file. The DNO side, and the difference between notifying and applying, is covered in G98 vs G99: DNO applications without the wait. The electrical certificate follows the same rules as any other electrical work; the EICR post explains how certificates with an expiry become future work.

> The handover pack is the last thing the customer sees from you and the first thing they show everyone else. — TradeYoke

### Where the certificate lives afterwards

Filing matters more for solar than for most trades, because the documents outlive the phone they were made on. A certificate filed in the document library against the customer and the job is there when the customer moves house, when the inverter fails in year eight, and when the supplier changes its SEG rules. Search inside PDFs finds it by the inverter serial number, which is usually what the customer has to hand.

Plans on the pricing page are per business. Solar firms that also do the electrical work run both trades on one account, which is what the two-trades post is about.

See also: the full Paperwork & compliance guide

### Questions people ask

**Can a customer get the Smart Export Guarantee without an MCS certificate?**

Suppliers must offer SEG to installations with an MCS certificate or an equivalent they recognise. In practice most suppliers ask for MCS, so an install by a non-certified installer usually cannot claim it. Check the individual supplier's terms.

**Does MCS cover batteries as well as panels?**

Yes. MCS publishes a standard for electrical energy storage, and battery installers can be certified against it. Note that SEG pays for electricity generated and exported; a battery on its own does not qualify, and export from a battery charged from the grid is treated differently by suppliers.

**Is the 0% VAT rate on solar tied to MCS?**

No. The VAT relief on energy-saving materials installed in residential property is a tax rule with its own conditions, not an MCS requirement. Confirm how it applies to a specific job with your accountant or HMRC's guidance.

**How long should the customer keep the certificate?**

For the life of the system. It is needed for SEG, for warranty claims, for some finance and insurance products, and for the buyer when the property is sold. That is why a filed copy on your side is worth keeping too.

### Issue the certificate and the pack from the job

TradeYoke's solar installer pilot produces the MCS data sheet, commissioning certificate and handover pack from the job and files them with the customer. Start a 30-day trial of Essentials with no card.

[Start your free trial](https://app.tradeyoke.net/signup)

]]></content:encoded>
      <dc:creator>TradeYoke team</dc:creator>
      <category>Solar</category>
      <category>Compliance</category>
      <enclosure url="https://tradeyoke.net/media/media-seed-cover-mcs-certificate-explained-for-installers-jpg/cover-mcs-certificate-explained-for-installers.jpg?v=hl4pat" type="image/jpeg" length="60885" />
      <media:content url="https://tradeyoke.net/media/media-seed-cover-mcs-certificate-explained-for-installers-jpg/cover-mcs-certificate-explained-for-installers.jpg?v=hl4pat" medium="image" />
    </item>
    <item>
      <title>G98 vs G99: DNO applications without the wait</title>
      <link>https://tradeyoke.net/blog/g98-vs-g99-dno-applications</link>
      <guid>https://tradeyoke.net/blog/g98-vs-g99-dno-applications</guid>
      <pubDate>Tue, 26 May 2026 13:15:11 GMT</pubDate>
      <description>G98 means install then notify the DNO within 28 days. G99 means apply and get approval before you commission. Here is the threshold, the paperwork, and how to stop the wait stalling the job.</description>
      <content:encoded><![CDATA[G98 covers small generators up to 16 amps per phase, which is 3.68 kW on a single-phase supply: install it, commission it, then notify the Distribution Network Operator (DNO) within 28 days. G99 covers anything larger: apply to the DNO and get approval before you commission. Pick the wrong one, or forget the paperwork, and a finished job sits unpaid while everyone waits.

The two Engineering Recommendations are published by the Energy Networks Association (ENA). This post is about the practical difference, and about keeping the application moving alongside the install rather than after it.

### G98 vs G99: where the threshold sits

The dividing line is the output of the generating equipment, which for solar means the inverter, not the panels. Up to 16 A per phase is G98. Above it is G99, which then has its own bands by size and connection type.

### The threshold at a glance

| Supply | G98 limit | What that means |
|---|---|---|
| Single-phase | 16 A per phase | Up to 3.68 kW of inverter output |
| Three-phase | 16 A per phase | Up to 11.04 kW of inverter output |
| Anything above | G99 | Apply before commissioning; the DNO assesses the connection |

Two traps catch people. Existing generation on the site counts towards the total, so adding a battery with its own inverter to a 3.68 kW array can push the premises into G99. And the threshold is about inverter output, not panel capacity: a 5 kWp array on an inverter capped at 3.68 kW is a G98 job, which makes inverter choice a design decision. Confirm the current documents on the ENA's site before relying on any of this.

[Energy Networks Association](https://www.energynetworks.org/): The ENA publishes the G98 and G99 Engineering Recommendations, the type-test register for inverters, and the 'find my network operator' lookup.

### G98: install, then notify within 28 days

For a single premises within the G98 limit you do not need permission. You install the system with type-tested equipment, commission it, and send the DNO the G98 notification within 28 days of commissioning. The notification carries the installer's details, the customer's details, the site, the equipment and its type-test reference, and the commissioning date.

The 28 days is the whole of the flexibility. Miss it and the install is unregistered, which surfaces later when the customer applies for the Smart Export Guarantee and the supplier asks for the DNO paperwork. If one job covers multiple premises in the same area, G98 requires an application before the installations rather than a notification afterwards, because the combined effect on the local network matters.

> 💡 Send the G98 notification from the commissioning visit, not from the office a fortnight later. It takes ten minutes while the inverter serial number is in front of you, and it is the document the SEG application will ask for.

### G99: apply first, then wait

Above the threshold the DNO has to assess whether the network can take the export before anything is connected. That means an application with a single-line diagram, a site plan, the inverter's type-test evidence, the proposed capacity and the export arrangement. The DNO responds with an approval, sometimes with conditions such as an export limit, or with a connection offer if network work is needed.

How long it takes depends on the DNO and the size of the job. A straightforward domestic G99 application is usually answered within the DNO's published timescale, often up to 45 working days; anything needing a network study takes longer. Your DNO publishes its own timescales, and they are the ones to plan against.

> ⚠️ Do not commission a G99 system before the approval is in writing. Energising a generator the DNO has not approved can put the customer's connection agreement, and your relationship with the DNO, at risk.

### The wait that stalls the job, and how to shorten it

The wait itself is not the problem. The problem is starting it too late: surveying in March, quoting in April, applying in June and then putting the install on hold. Three habits keep the job moving.


 Apply the day the survey confirms the size. Whether the customer has signed yet or not, an application costs little and the clock starts.
 Use type-tested inverters. Equipment on the ENA's type-test register needs no separate compliance evidence, which is the most common reason an application bounces.
 Design to the threshold when it is honest to. Where the customer's use fits a 3.68 kW export, a G98 design with export limitation avoids the wait entirely. Where it does not, say so and apply.

### Tracking the application on the job

The application is a task with a status, a date and a document, and it belongs on the job, not in someone's inbox. The Solar installer trade in TradeYoke is in pilot with real installers and treats it that way: a G98 or G99 connection assessment on the job, DNO contacts by region so the right operator is a click away, the type-test documents and single-line diagram attached, and a boundary map of the site. The solar installer page covers the pilot.

When the approval arrives it is filed with the job, and it goes into the handover pack described in the MCS certificate post. The customer sees the status without ringing, which is most of what they wanted.

[Image: The jobs list filtered to one trade: every solar job in one place, with its priority, place and date — and the DNO application tracked on the job record.]

### The G99 application pack

- ✓ Single-line diagram — Generator, inverter, protection, isolation and the point of connection.
- ✓ Site plan and boundary — Where the equipment sits and where the supply enters.
- ✓ Inverter type-test evidence — The ENA register reference, or full compliance evidence if not registered.
- ✓ Capacity and export arrangement — kW output, phases, and any export limitation scheme.
- ✓ Customer and MPAN details — The supply number from the electricity bill.
- ✓ Installer details — Including who to contact with questions.

Jobs that wait on paperwork are also jobs that wait to be paid. A deposit at booking and a pay link on commissioning, as described in how tradespeople get paid the same day, keep the cash moving while the DNO does its work. Pay links are part of the Premium plan and the customer portal is part of Ultimate on the pricing page; pilot trades are priced with the pilot businesses. Installers who also do the electrical certification will find the electrician page useful too.

### Questions people ask

**Can I commission a G99 system before the approval comes back?**

No. G99 requires the DNO's agreement before the generator is connected. If the customer needs the system live sooner, the honest options are a G98-sized design with export limitation or a conversation with the DNO about timescales, not an early switch-on.

**Does adding a battery change the application?**

Often. A battery with its own inverter adds generating capacity in the DNO's terms, and the total on the premises is what counts against the 16 A per phase limit. A hybrid inverter can keep the total within G98; a separate battery inverter may not. Work it out at design time.

**How do I find out which DNO covers a site?**

The Energy Networks Association runs a postcode lookup for the network operator, and the customer's electricity bill shows the MPAN, whose distributor ID identifies the DNO. Regional DNO contacts are stored in the TradeYoke solar pilot so the right one is on the job.

**What if I forgot to send a G98 notification?**

Send it now. The DNO would rather have a late notification than none, and the customer's Smart Export Guarantee application will need the paperwork. Then move the notification into the commissioning visit so it cannot be forgotten again.

### Keep the DNO application on the job, not in an inbox

TradeYoke's solar installer pilot tracks G98 and G99 applications with the diagram, the type-test evidence and the DNO contact on every job. Start a 30-day trial of Essentials with no card.

[Start your free trial](https://app.tradeyoke.net/signup)

]]></content:encoded>
      <dc:creator>TradeYoke team</dc:creator>
      <category>Solar</category>
      <category>Compliance</category>
      <enclosure url="https://tradeyoke.net/media/media-seed-cover-g98-vs-g99-dno-applications-jpg/cover-g98-vs-g99-dno-applications.jpg?v=3x7qadx" type="image/jpeg" length="61932" />
      <media:content url="https://tradeyoke.net/media/media-seed-cover-g98-vs-g99-dno-applications-jpg/cover-g98-vs-g99-dno-applications.jpg?v=3x7qadx" medium="image" />
    </item>
  </channel>
</rss>