Solar MCS & DNO documents
The MCS pack, the DNO paperwork and the handover, from one job
MCS handover pack software for solar installers: the MCS submission data sheet, G98 notification and G99 A1-1 application, connection assessment, commissioning certificate, type-test documents and the customer handover pack, generated from the job, with OpenSolar design import.
30-day free trial · No card required · Web app today, mobile & Windows apps in pilot

- Web Open nowBeta
Coming soon
Coming soonComing soon
Included onEssentials and above
A solar install produces more paperwork than any other domestic trade. The Solar Installer module keeps it on the job: the connection is classified so you know whether it is a G98 notify-after or a G99 apply-first; the DNO directory finds the right operator for the postcode; the MCS data sheet, commissioning certificate and handover pack render from the job's data; type-test documents for the inverter and panels attach; and the handover tracker shows what has been produced and what is still missing before the customer gets their pack.
What it does
Solar MCS & DNO documents in TradeYoke
MCS submission data sheet
Rendered from the job's system, installer and customer data.
G98 and G99
Connection classified from the system size; G98 notification or G99 A1-1 application produced accordingly.
DNO directory and contacts
The right distribution network operator for the postcode, with its contacts on the job.
Commissioning certificate
Issued when the system is commissioned; filed with the pack.
Handover pack and tracker
The customer pack assembled from the job's documents, with a tracker of what is done and what is missing.
OpenSolar import
Pull the design and proposal from OpenSolar into the job.

The real thing
As it looks today
A real screen from the product, not a mock-up. The same screen is on the phone app.
MCS, DNO, handover
Generated from the job, not re-typed

On the roof
The design, already on the job
Import the design from OpenSolar so the data sheet fills itself.

Everything the job knows, filled in 
Commissioning
The handover pack, issued on site
The commissioning certificate and customer handover pack are issued as PDFs from the job.

The handover, checked off before you leave
Where the paperwork lives



The details
Also worth knowing
- Type-test documentsInverter and panel type-test certificates attached to the job and included in the pack.
- Boundary mapThe site boundary map produced for the application.
- Everything in the Document LibraryEvery generated document files against the job and the customer.
Questions
Asked about solar mcs & dno documents
Does it submit to the DNO?
It produces the G98 notification or G99 application and finds the DNO's contacts; submission is by you to the DNO. ENA Connect submission is not a feature yet.
Is it MCS-certified software?
It produces the documents an MCS installer needs from the job; MCS certification is the installer's.
Which design tools import?
OpenSolar today.
Try solar mcs & dno documents on your own work
30 days of Essentials free, no card. Import your customers and see it against a real week.