Solar MCS & DNO documents

The MCS pack, the DNO paperwork and the handover, from one job

MCS handover pack software for solar installers: the MCS submission data sheet, G98 notification and G99 A1-1 application, connection assessment, commissioning certificate, type-test documents and the customer handover pack, generated from the job, with OpenSolar design import.

30-day free trial · No card required · Web app today, mobile & Windows apps in pilot

TradeYoke solar documents: the handover pack, MCS submission, DNO notification and commissioning certificate for every install
Available on

A solar install produces more paperwork than any other domestic trade. The Solar Installer module keeps it on the job: the connection is classified so you know whether it is a G98 notify-after or a G99 apply-first; the DNO directory finds the right operator for the postcode; the MCS data sheet, commissioning certificate and handover pack render from the job's data; type-test documents for the inverter and panels attach; and the handover tracker shows what has been produced and what is still missing before the customer gets their pack.

What it does

Solar MCS & DNO documents in TradeYoke

MCS submission data sheet

Rendered from the job's system, installer and customer data.

G98 and G99

Connection classified from the system size; G98 notification or G99 A1-1 application produced accordingly.

DNO directory and contacts

The right distribution network operator for the postcode, with its contacts on the job.

Commissioning certificate

Issued when the system is commissioned; filed with the pack.

Handover pack and tracker

The customer pack assembled from the job's documents, with a tracker of what is done and what is missing.

OpenSolar import

Pull the design and proposal from OpenSolar into the job.

A solar handover pack in TradeYoke: the system, serial numbers, test results and warranties, ready to send

The real thing

As it looks today

A real screen from the product, not a mock-up. The same screen is on the phone app.

MCS, DNO, handover

Generated from the job, not re-typed

  1. A solar installer in a hi-vis vest and hard hat fitting a panel on a roof

    On the roof

    The design, already on the job

    Import the design from OpenSolar so the data sheet fills itself.

    Starting an MCS submission in TradeYoke on a phone, with everything the job already knows filled in
    Everything the job knows, filled in
  2. A solar installer checking a panel installation on a roof

    Commissioning

    The handover pack, issued on site

    The commissioning certificate and customer handover pack are issued as PDFs from the job.

    TradeYoke on a phone: the handover checklist, what has been shown, what has been sent and what is still to do
    The handover, checked off before you leave

Where the paperwork lives

The details

Also worth knowing

  • Type-test documentsInverter and panel type-test certificates attached to the job and included in the pack.
  • Boundary mapThe site boundary map produced for the application.
  • Everything in the Document LibraryEvery generated document files against the job and the customer.

Questions

Asked about solar mcs & dno documents

Does it submit to the DNO?

It produces the G98 notification or G99 application and finds the DNO's contacts; submission is by you to the DNO. ENA Connect submission is not a feature yet.

Is it MCS-certified software?

It produces the documents an MCS installer needs from the job; MCS certification is the installer's.

Which design tools import?

OpenSolar today.

Try solar mcs & dno documents on your own work

30 days of Essentials free, no card. Import your customers and see it against a real week.